ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
ABSTRACT This project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of re-designing it for its effective use by IMT community and visitors of IMT. But before the road is being... Continue Reading
ABSTRACT The work was an attempt to evolve a quicker and easier means of reaching high places and point safely in tall buildings and other high structures. This has no doubt saved consideration cost of employing cranes. A very clear account of the introduction and literature background of the project has been discussed in details. The report also... Continue Reading
The aim of this research work is to discover how maintenance of buildings and infrastructures can be effected, effectively to help increase the workers output thus increasing labour efficiency and increasing the income of the nation leading to increased income per capita of the populace. The objectives of this research work are as follows: (a)... Continue Reading
Background of the Study: Every construction company all over the world expects not only to break even in every project undertaken, but to also make a reasonable level of profit that will satisfy the owners of the company. This is only possible if the activities involved in undertaking any particular project are optimized, viz-á-viz the factors of... Continue Reading
This project proposes the use of a propellers to power a lightweight vehicle as a non-conventional means of transportation within the school environment. Propellers work based on the generation of thrust sufficient enough to move a mass (in this case, a lightweight, three-wheeled vehicle) to which it is connected. The propeller powered vehicle... Continue Reading
Abstract This project outlines the structural design of eight-storey reinforced concrete hostel building following British standard, BS: 8110, part 1, 1997 “Structural use of Concrete”. The project aimed at producing structural design of eight storey hostel. The research was achieved based on the objectives of; developing structural layout... Continue Reading
In this study of designing a wind turbine using wind energy potential, a case of FUTA. Weibull distribution function method was adopt with the help of probability density function and cumulative density function analysis, the wind speed characteristics and energy potential of the study area was investigated using hourly wind speed data that span... Continue Reading
ABSTRACT Walling materials play a vital role in the construction of buildings. The study run a comparative analysis between Hydraform blocks and sandcrete blocks which are both major components of walling to ascertain which block is more cost effective, has high compressive strength and compare the benefit of Hydraform block to sandcrete block.... Continue Reading
ABSTRACT Variation order is a common phenomenon in construction projects. It involves an amendment of the original scope of a project as in the contract. Variation orders are caused from various factors.Variations often cause disputes and dissatisfactions among the parties involved in construction projects. Thus, it is very important to control... Continue Reading