DESIGN AND IMPLEMENTATION OF A COMPUTERIZED BILL OF QUANTITY SYSTEM FOR QUANTITY SURVEYORS

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1003
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Format: Microsoft Word
  • Views: 1.1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Quantity surveyors due to the essential services they render private and virtually to everyone as well as the indispensable position they occupy in this age of travel boon and shelter they cannot be left out in this world of computerization.

More so, when one talks of the huge capital that is involved in the establishment and running of quantity surveying as well as the dynamic nature of it’s business, one will readily welcome machines such as computer to assist man.

This project work is aimed at designing and implementing a bill of quantity system for quantity surveyors.

In Nigeria especially, the method used by most surveyors firm is manual, even though the nature and growth of the business has continued to demand for a better method. This manual method is lade with problems that are inherent such slow or sluggish nature, loss of paper and inaccuracy in the Okolo, Okolo & Co. surveying industry.

Further more, this project is aimed at designing software that will take care of above mentioned lapses and reduce also the number of employees handling the job there by reducing cost. It will also provide a better and eligible analysis of Bill of quantity material; as well ensure free flow of an information form the location (company) to the site.

TABLE OF CONTENTS

Title Page

Table of Content

Abstract

CHAPTER ONE

INTRODUCTION

1.1     Background of the Study

1.2     Statement of Study

1.3     Purpose of Study

1.4     Aims and Objectives Study

1.5     Scope of the Study

1.6     Limitations

1.7     Definitions of Terms

CHAPTER TWO

LITERATURE OVERVIEW

CHAPTER THREE

DESCRIPTION AND ANALYSIS OF THE EXISTING SYSTEM

3.1     Fact finding methods used

3.2     Organizational Structure

3.3     Objectives of the Existing System

3.4     Input, Process and Output Analysis

3.5     Information Flow Chart

3.6     Problems of the Existing System

3.7     Justification for the New System

CHAPTER FOUR

DESIGN OF THE NEW SYSTEM

4.1     Output Specification Design

4.2     Input Specification and Design

4.3     File Design

4.3     Procedure Chart

4.4     System Flowchart

4.5     System Requirements

CHAPTER FIVE

IMPLEMENTATION

5.1     Program Design

5.2     Program Flowchart

5.3     Pseudocodes

5.4     Source Program

5.4     Test Run

CHAPTER SIX

DOCUMENTATION

6.1     System Documentation

6.2     Program Documentation

6.3     User Documentation 

CHAPTER SEVEN

7.0     CONCLUSION AND RECOMMENDATION

7.1     Conclusion

7.2     Recommendation

          BIBLIOGRAPHY

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF STUDY

The ultimate goal of any establishment is effectiveness. This is achieved only when there is a proper co-ordination of activates between the various units that comprise the system. The co-ordination is even more important in a surveying system where the desired end is to examine the general condition of the land before building and construction. Ineffectiveness of a surveying firm (system) could diminish in its abilities to relief in human pains and trouble or worse still produce irreversible consequence. Any measures there for that can improve the need response surveyors management and its general efficiency is most welcomed, and a computer based system could be of the almost help.

However, a computer base bill of quantity system for quantity surveyors which is the topic of this researcher will enable the site engineers, operative surveyors to determine the accurate land and materials for the required operative surveyors to determine the accurate land and materials for the required operation, therefore, saving some precious time in the site. 

1.2    STATEMENT OF THE PROBLEM

The regular flood of clients to the surveying industry at the end of every day to lodge complaints and the subsequent inefficiency of the system is a regular source of embarrassment to all concerned in the surveying industry. Moreover, the management (Quantity surveyor site engineers, site clerks and operatives, etc) have been equally unable to monitor the land and material for the required operation also to provide a better and eligible analysis of bill of quantity system of the land on both daily and monthly bases. This too has become a considerable frustration to all concerned as well as negated the primary aims of the establishment.

 As a result of the above problems, clients become doubtful about the quality of the job they receive, the surveying industry thereby loses money and materials, hence it progress is returned.

1.3    PURPOSE OF THE STUDY

The purpose of bill report is to consider the changing environment of surveying industry and to report to the profession. On the practical steps which might be taken to ensure that it is able to deal with the increasingly sophisticated demands which are likely to occur in the changing environment.

1.4    AIMS AND OBJECTIVES

The aim and objectives of this project on the available billing system are: -

1.           To find out if the already existing is efficient, adequate and sufficient.

2.           Highlight the inefficiency in the available method through which computer application can reduce and eliminate inefficiency.

1.5   SCOPE OF THE STUDY

The report takes into consideration the developments which have taken place in the last twenty years.

In 1961, the royal institution of chartered surveyors set up a working up quantities in the constitution industry, this study is narrowed to the following areas: - 

a.    A program that will effectively handle client bills.

b.   A program that handles name, account, phone numbers and price list.

c.    Record of the companies clients

d.   Record of clients can be retrieved and update if necessary

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED BILL OF QUANTITY SYSTEM FOR QUANTITY SURVEYORS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1003
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Format: Microsoft Word
  • Views: 1.1K

500
Leave a comment...

    Related Works

    ABSTRACT Quantity surveyors due to the essential services they render private and virtually to everyone as well as the indispensable position they occupy in this age of travel boon and shelter they cannot be left out in this world of computerization.  More so, when one talks of the huge capital that is involved in the establishment and running of... Continue Reading
    ABSTRACT Quantity surveyors due to the essential services they render private and virtually to everyone as well as the indispensable position they occupy in this age of travel boon and shelter they cannot be left out in this world of computerization. More so, when one talks of the huge capital that is involved in the establishment and running of... Continue Reading
    ABSTRACT The world over, a vast number of developing countries are trying to achieve sustainable economic growth in every sector and more equitable distribution of the benefits of growth. The United Nations millennium development goals have identified key areas for development which also embrace environmental development. It forms part of its... Continue Reading
    ABSTRACT It is interesting to bring to light the demands challenges and development in the twenty-first century the key role of the quantity surveying profession in the economic with emphasis on an appraisal of the quantity surveyor cost control in Nigeria construction industry. The work shall attempt to explore the quantity surveyor who is... Continue Reading
    : The construction industry requires continuous evaluation and  formulation of risk management index, but Nigeria is yet to introduce a risk  rating tool for the industry. This paper therefore assessed risk management  practice in Nigeria construction industry and establishes Risk Management  Index (RMI). Structural questionnaire were... Continue Reading
    : The construction industry requires continuous evaluation and formulation of risk management index, but Nigeria is yet to introduce a risk rating tool for the industry. This paper therefore assessed risk management practice in Nigeria construction industry and establishes Risk Management Index (RMI). Structural questionnaire were administered to... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainties. With construction targets not being met and high rate of abandoned construction projects, there is great need for proper risk assessment and... Continue Reading
    ABSTRACT It is interesting to bring to light the demands challenges and development in the twenty-first century the key role of the quantity surveying profession in the economic with emphasis on an appraisal of the quantity surveyor cost control in Nigeria construction industry. The work shall attempt to explore the quantity surveyor who is... Continue Reading
    (A CASE STUDY OF EMENITE NIG. LTD. EMENE, ENUGU) ABSTRACT With the trend of technology growth in the world of today, virtually every facet of human work has been affected; even the remotest of it all, and the production circle cannot be left out. This study was carried out to... Continue Reading
    ABSTRACT With the trend of technology growth in the world of today, virtually every facet of human work has been affected; even the remotest of it all, and the production circle cannot be left out.  This study was carried out to verify all the manual processes involved in bill-of-material processing system and to seek a way of automating the... Continue Reading
    Call Us Get this work