REFURBISHING OF A FIXED AND FLUIDIZED BED

  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0218
  • Access Fee: ₦5,000 ($14)
  • Pages: 34 Pages
  • Format: Microsoft Word
  • Views: 573
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

The repair of the fixed bed adsorption column, a product of arm field technical company was carried out for the purpose of bringing the faulty equipment back to its normal operating system.
Before this exercise, the equipment was out of operation because of the completely blocked base of the fixed bed column (water column) and the malfunctioning of the air control value.
The sintered bronze plate which formed the base of the water column was cleaned up and freed from debris which originally blocked the porosity of the plate to an unacceptably level.  To do this, the plate was soaked in a diluted acetic acid and a current of air used to free the tiny openings from blockage.  Later, the air control valve where properly reactivated, rectified and recalibrated.
At the end the operation of the equipment came back to normal functioning.  The entire equipment was cleaned up and lubricated.
The fluidized bed was run and found to be in good order.

TABLE OF CONTENT
Title page
Letter of transmittal
Acknowledgement
Dedication
Abstract
Table of content

CHAPTER ONE
1.0  INTRODUCTION

CHAPTER TWO 
2.0   LITERATURE REVIEW
2.1   Absorption
2.2   Types of Absorption
2.2.1 Physical Absorption
2.2.2 Chemical Absorption
2.3    Absorbents 
2.4    Desorption
2.4.1 Desorption Methods
2.5    Desorption Operation
2.5.1 Stagewise Operation
2.5.2 Continuous Contact 
2.6    Analysis of Fixed – Bed Adsorption
2.7    Adsorption of Solute from Dilute Solution
2.8    The Process of Welding
2.8.1 Oxy-Acetylene Welding 

CHAPTER THREE
3.0    REFURBISHING PROCEDURE

CHAPTER FOUR
4.0   OPERATION OF THE EQUIPMENT

CHAPTER FIVE
5.0   Conclusion 

CHAPTER SIX
6.0   Recommendation 

REFURBISHING OF A FIXED AND FLUIDIZED BED
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0218
  • Access Fee: ₦5,000 ($14)
  • Pages: 34 Pages
  • Format: Microsoft Word
  • Views: 573

500
Leave a comment...

    Related Works

    ABSTRACT             This project is concerned write the identification of those defects that are found in most of the drawing tables in the Mechanical Engineering drawing studio.             The report investigates the possible ways through which the mentioned above can be brought back to normal standard for usage ins the... Continue Reading
    ABSTRACT This project is concerned write the identification of those defects that are found in most of the drawing tables in the Mechanical Engineering drawing studio. The report investigates the possible ways through which the mentioned above can be brought back to normal standard for usage... Continue Reading
    ABSTRACT The objective of the repair and refurbishing the pilot plant temperature control equipment is to keep the apparatus in good working condition for it to be used for its various purposes. The part of the temperature control changed and new one installed. This was due to series of faults developed by the former one” Electrical accessories... Continue Reading
    ABSTRACT The objective of the repair and refurbishing the pilot plant temperature control equipment is to keep the apparatus in good working condition for it to be used for its various purposes. The part of the temperature control changed and new one installed. This was due to series of faults developed by the former one” Electrical accessories... Continue Reading
    ABSTRACT             With the rapid development in Computer Technology, most organization have embraced the use of computer resources in its activities to enable them achieve its set down objectives. Electronic data processing is a wonderful tool which is used extensively in financial accounting to implore performance and accuracy.      ... Continue Reading
    (A CASE STUDY OF UNITED AFRICAN COMPANY OF NIGERIA (UACN) DEVELOPMENT COMPANY PLC LAGOS) ABSTRACT With the rapid development in Computer Technology, most organization have embraced the use of computer resources in its activities to enable them achieve its set down objectives.... Continue Reading
    ABSTRACT The study investigates the effect of propagation impairments such as rain, cloud, gases and tropospheric scintillation on fixed satellite communication link on earth-space path for frequencies between 10 and 50 GHz at Ku, Ka and V bands for 37 locations in Nigeria. Two standard elevation angles of 50, 550 as well as some elevation angles... Continue Reading
    TABLE OF CONTENTS DECLARATION ........................................................................................................................................................ 1 APPROVAL... Continue Reading
    ABSTRACT Sub-Saharan Africa (SSA) has attracted substantial amounts of Official Development Assistance (ODA) over the years. General ODA flows to the continent currently stands at around $80 billion per annum and the figure is projected to be well above $125 billion due to the Sustainable Development Goals. Over the last five decades, SSA has... Continue Reading
    Abstract  This project report deals with the class of asymptotically demicontractive mappings in Hilbert spaces. We noted some historical aspects concerning the concept of asymptotically demicontractivity and studied a regularized variant of the Krasnoselskii-Mann iteration scheme, which ensured the strong convergence of the generated sequence... Continue Reading
    Call Us Get this work