The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility (PHCN) is off by cranking the starter and a provision was made to stop cranking when the generator is fully started. A delay was provided to stop the generator five minutes after the PHCN is restored to avoid unnecessary off and on. A display that shows when PHCN or GEN is on was provided.

TABLE OF CONTENT
COVER PAGE……………………………………………………………i
TITLE PAGE …………………………………………………………..…ii
APPROVAL PAGE…………………………………… …………………iii
DEDICATION …………………………………………………………....iv
ACKNOWLEDGEMEN ………………………………………………. …v
ABSTRACT………………………………………………………………..vi

TABLE OF CONTENTS…………………………………………………..vii

CHAPTER ONE: INTRODUCTION…………………………..………….1
1.1 BACKGROUND OF STUDY…………………………………………...1
1.2 AIMS AND OBJECTIVE………………………………………………..2
1.3 RELEVANCE OF THE STUDY…………………………………………3
1.4 SCOPE OF THE PROJECT………………………………………………4
1.5 STATEMENT OF THE PROBLEM……………………………………...5
1.6 IMPORTANCE OF THE STUDY…………………………………………7
viii
1.7 PROJECT REPORT ORGANIZATION…………………...........................8

CHAPTER TWO: LITERARTURE REVIEW…………………..……………9
2.1 HISTORICAL BACKGROUND………………………...............................9
2.2 DISCRIPTION OF COMPONENTS USED ………………………………13
2.3 CONTACTOR………………………………………………………… …13
2.3.1 OPERATING PRINCIPLES………………….………………………….15
2.3.2 APPLICATIONS…………………………………….…………………...17
2.4 RESISTORS………………………………………………………………..18
2.4.1a USES OF RESISTORS………………………………………………….19
2.4.1b TYPES OF RESISTORS………………………………………………...19
2.4.1c FIXED RESISTORS……………………………………………………..20
2.4.1d VARIABLE RESISTORS………………………………………………..20
2.5 CHARACTERISTICS OF RESISTORS…………………………………….21
2.6 CAPACITORS……………………………………………………………….21
2.6a TYPES OF CAPACITORS ……………………………………… …...........22
ix
2.6b USES AND APPLICATION OF CAPACITORS…………………………..22
2.7 TRANSFORMERS…………………………………………………………...23
2.7a USES OF TRANSFORMER………………………………………………...25
2.8 RELAYS………………………………………………………………………25
2.8a TYPES OF RELAYS………………………………………………………..26
2.8b FACTORS TO CONSIDER BEFORE SELECTING A RELAY…………..27
2.8c APPLICATION OF RELAY………………………………………………..28.
2.9 DIODES………………………………………………………………………28
2.9a USES OF DIODES………………………………………………………….29
2.10 CRYSTAL OSCILLATORS…………….......………………………………29
2.10a TYPES OF CRYSTAL OSCILLATORS...………………………………...29
2.10b TERMS ASSOCITED WITH CRYSTAL OSICLLATORS………...…….30
2.1Oc APPLICATION AND USES OFF CRYSTAL OSCILLATORS...………31
2.11 REGULATORS………………………………………………………...…...31
2.11a APPLICATION AND USES OF REGULATOR……………………….…32
2.12 TRANSISTORS……………………………………………………………..32
2.12a TYPES OF TRANSISTORS……………………………………………….33
2.12b USES OF TRANSISTORS………………………………………………...33
2.13 PROGRAMMABLE INTERFACE CONTROLLER (PIC)………………..34
2.14 SEVEN SEGMENT DISPLAY (SSD)……………………………………...35

CHAPTER THREE: SYSTEM OPERATION……………….………………..37
3.1 BLOCK DIAGRAM AND OPERATION……………………………………37
3.2 CIRCUIT DIAGRAM AND OPERATION………………………………….44

CHAPTER FOUR: CIRCUIT DESIGN AND OPERATION………………….48
4.0 CIRCUIT DESIGN AND OPERATION………….………………………….48
4.1 CHOICE OF CONTACTOR………………………………………………….48
4.2 CHOICE OF TRANSFORMER………………………………………………48
4.3 CALCULATION FOR RECTIFICATION…………………………………...49
4.4 GENERATOR TURNOFF DELAY………...………………………………..50
4.5 COMPLETE DESIGNED CIRCUIT OF THE DISPLAY AND CONTROL………………………...51
4.6 CALCULATION FOR THE SEVEN SEGMENT TRANSISTOR SWITCHING…………………...55
4.7 CURRENT DEMAND FOR THE DISPLAY UNIT…………………………55
4.8 DISPLAY PROGRAM SOURCE CODE………….………………………...56

CHAPTER FIVE
5.1 TESTING, RESULT AND PROJECT COSTS………………………………60
5.2 TESTING……………………………………………………………………..60
5.2a VOLTAGE TESTS…………………………………………………………..60
5.2b RESISTANCE TESTS………………………………………………………61
5.2C OPERATION TESTS……………………………………………………….63

CHAPTER SIX
6.1 CONCLUSION……………………………………………………………..67
6.2 RECOMMEDATION……………………………………………………….70
REFRENCES…………………………………………………………………….71
DESIGN AND CONSTRUCTION OF A 60AMP THREE PHASE AUTOMATIC CHANGE OVER SWITCH.
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0174
  • Access Fee: ₦5,000 ($14)
  • Pages: 14 Pages
  • Format: Microsoft Word
  • Views: 735

500
Leave a comment...

    Related Works

    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading