DESIGN AND IMPLEMENTATION OF A COMPUTERIZED PERSONNEL AUDITS SYSTEM. A CASE STUDY OF STATE SCHOOL MANAGEMENT BOARD ENUGU.

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1169
  • Access Fee: ₦5,000 ($14)
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 667
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is need for auditing personnel auditing.
In recognition, the work is geared towards the computerization of the existing system of processing data as well as identifying the various problem which one encountered in various staffs financial statement of account and to recommend an auditing /processing in the firm.
The justification of this, lies on the uses of manual auditing operation. Finally, the thesis was concluded with the implementation, programming, text run and change over process of the new system.

TABLE OF CONTENT

COVER PAGE
CERTIFICATION
DEDICATION
ACKNOWLEDGEMENT
ABSTRACT

CHAPTER ONE
1.1 INTRODUCTION
1.2 THE CASE STUDY
1.2.1 THE NEW SYSTEM
1.2.2 BACKGROUND INFORMATION
1.3 OPERATIONS IN THE PRESENT SYSTEM
1.4 AIM’S/OBJECTIVES OF THE STUDY
1.5 SIGNIFICANCE OF STUDY
1.6 SCOPE OF THE STUDY AND LIMITATION

CHAPTER TWO
LITERATURE REVIEW
CHAPTER THREE
3.0 DESCRIPTION AND ANALYSIS OF EXISTING SYSTEM
3.1 FACTS FINDING METHODS
3.2 OBJECTIVES OF THE EXISTING SYSTEM
3.3 INPUT PROCESS AND OUTPUT ANALYSIS
3.4 PROBLEM WITH EXISTING SYSTEM
3.5 JUSTIFICATION OF THE NEW SYSTEM

CHAPTER FOUR
4.1 INTRODUCTION
4.2 OUTPUT DESIGN
4.3 INPUT DESING
4.4 DATABASE FILE DESIGN AND SPECIFICATION
4.5 OVERVIEW TO TOP-DOWN DESIGN
4.6 OVERVIEW OF PROGRAM FLOWCHART

CHAPTER FIVE PROGRAM DESIGN AND SPECIFICATION
5.1 INTRODUCTION
5.2 JUSTIFICATION
5.3 PROGRAM STRUCTURE
5.4 MENU STRUCTURE
5.5 SYSTEM IMPLEMENTATION
5.5.1PROGRAM STRUCTURE
5.5.2 TRAINING AND RE-TRAINING OF STAFF.
5.5.3 FILE CONVERSION

CHAPTER SIX
DOCUMENTATION 
CHAPTER SEVEN
1.1 CONCLUSION
1.2 RECOMMENDATION.

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED PERSONNEL AUDITS SYSTEM. A CASE STUDY OF STATE SCHOOL MANAGEMENT BOARD ENUGU.
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1169
  • Access Fee: ₦5,000 ($14)
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 667

500
Leave a comment...

    Related Works

    ABSTRACT The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is need for auditing personnel auditing. In recognition, the work is... Continue Reading
    ABSTRACT The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is need for auditing personnel auditing. In recognition, the work is... Continue Reading
    DESIGN AND IMPLEMENTATION OF A COMPUTERIZED PERSONNEL AUDITS SYSTEM ABSTRACT The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is... Continue Reading
    ABSTRACT The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is need for auditing personnel auditing.           In recognition,... Continue Reading
    ABSTRACT Regrettably, it is worthy to note that several years after independence, that the statutory allocation is in the doldrums, people expectation on the government continues to rise. Every responsible government is always anxious to provide at least the very basic amenities for the people in addition to the payments of salaries and allowance... Continue Reading
    ABSTRACT Regrettably, it is worthy to note that several years after independence, that the statutory allocation is in the doldrums, people expectation on the government continues to rise. Every responsible government is always anxious to provide at least the very basic amenities for the people in addition to the payments of salaries and allowance... Continue Reading
    ABSTRACT This project is to address the problems encountered by the staff of custom and their customers. In view of this problems, the manual process involved in the handling and management of goods in custom office were critically studied and the problems noted. This project went further to treat the different techniques used in implementing the... Continue Reading
    ABSTRACT The manual approach used in the regulation of the school activities by the management board is very tedious and stressful.  This research work investigated into the complications encountered due to the debilitation of man-power admitted into the school management with respect to how indepth it affects other operational system that... Continue Reading
    ABSTRACT The manual approach used in the regulation of the school activities by the management board is very tedious and stressful. This research work investigated into the complications encountered due to the debilitation of man-power admitted into the school management with respect to how indepth it affects other operational system that conduct... Continue Reading
    TABLE OF CONTENTS Cover page Title page Certification Dedication Acknowledgement Abstract Table of contents CHAPTER ONE INTRODUCTION 1.1 Background of the study 1.2 Aims/objective of the project 1.2.1 Statement/Purpose 1.3 Justification of the project 1.4 Scope of the study 1.5 Methodology CHAPTER TWO 2.0 Literature review CHAPTER THREE 3.0... Continue Reading
    Call Us Get this work