ABSTRACT

The sets of seizes with shaker which was fabricated and assembled in the Chemical Engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles, besides, this, it was also fabricated sizes or diameter of the solid particles of a substances by allowed it pass through the pores or a partures of the size plates.
    The process of operation involved the following: Marketing out of the sieve plate using dimension of 135mm and the shakers basing with dimension 2.4 mm on the corrugation iron sheet using a scriber and a steel rule, punching of the marked act line using hammer and chisel, cutting of the punched path of the sieve using guillotine, but in the case of the sieve mesh a shearer was used in the cutting, folding of the corrugated iron using drilling machine, welding of the sieve plate and the handles using oxyacetylure flame, filling of the holes on the welded edges with body filler, smoothing of the sieve plate using sand paper and lastly the painting and sun drying of the sieve plate using on oil plant.The shaker base with the dimension 2.4mm by 1.8mm was fabricated to house the motor, which comprised of a rotor, stator and coil and a capacitor of 2700 coulomb.
    At the end, all the parts were assembled and a sieve equipment of commendable efficiency was fabricated wit the specific dimensions mentioned above and a regulator.



TABLE OF CONTENTS

Title Page                                    ii
Letter of Transmittal                         iii
Approval Page                                v
Dedication                                 vi
Acknowledgment                            v
Abstract                                     ix
Table of Contents                            xi

CHAPTER ONE
1.1    Introduction                             1
1.2    Background of the Study                    5
1.3    Aims and Objectives                        6

CHAPTER TWO
2.1    Literature Review                        8
2.2    Definition of Sieve                        11

CHAPTER THREE
2.3    Fabrication Procedures                     36

CHAPTER FOUR
4.1    Discussion                             44

CHAPTER FIVE 
5.1    Conclusion and Recommendation             48
Reference                                 50













THE CONSTRUCTION OF SIEVE ANALYSIS EQUIPMENT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0440
  • Access Fee: ₦5,000 ($14)
  • Pages: 58 Pages
  • Format: Microsoft Word
  • Views: 191

500
Leave a comment...

    Related Works

    THE CONSTRUCTION OF SIEVE ANALYSIS EQUIPMENT ABSTRACT The sets of seizes with shaker which was fabricated and assembled in the Chemical Engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles, besides, this, it was also fabricated sizes or diameter of... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid them in practical involving the separation of solid particles. Besides this, it was also fabricated sizes or diameter of the solid particles of a substance by allowing... Continue Reading
    ABSTRACT The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu. The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of various sizes. The... Continue Reading
    ABSTRACT The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu. The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of... Continue Reading
    Cassava is produced in a large quantity in Nigeria. One of the products emerging  from its processing has turned out to be a major staple food in the nation, which is ‘garri’.  Due to insufficient and inadequate processing equipment; cassava has been susceptible to  wastage and ‘garri’ production has been reduced in scale, thereby... Continue Reading
    Cassava is produced in a large quantity in Nigeria. One of the products emerging  from its processing has turned out to be a major staple food in the nation, which is ‘garri’.  Due to insufficient and inadequate processing equipment; cassava has been susceptible to  wastage and ‘garri’ production has been reduced in scale, thereby... Continue Reading
    ABSTRACT The motive of this project is to construct  equipment for deodorizing kerosene, hence the smell of kerosene is totally eradicated. The equipment was constructed with flat sheet plates of a desired standard, the dimension and the truncated parts were coupled and welded in order to fasten the parts together.  The material was selected to... Continue Reading
    Call Us Get this work