An Evaluation of Budgeting and Cost Control of a Building Construction Industry

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0187
  • Access Fee: ₦5,000 ($14)
  • Pages: 42 Pages
  • Format: Microsoft Word
  • Views: 292
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

 

CHAPTER ONE

1.0    INTRODUCTION

1.01 (Background of the study)

According to Luke chapter 14 verses 28-30 which says for which of you intending to build a tower siteth not down first and counteth the cost whether he have sufficient to finish it? Lest haply, after he hath laid the foundation, and is not able to finish it, all that behold it began to mock him. The above quotation from the Bible summarizes the problem of abandoned project after committing huge financial resources on them are getting out of hand in Nigeria. It is obvious that poor budgetary planning and cost control is responsible for failure of those project as most failures could be traced to poor funding in the project. According to Iwu Anthonia (2006) Sited that cost control should be exercised at the execution phase as the budget is the financial compass for comparing projected and actual cost of the project in budgeting knowledge of why cost may change from one period to the next is very essential. Cost control should not be achieved without good understanding of source of cost variance. It is expected that within the budgeted project cost, the project be designed to provide at least good value for client’s money in terms of profitability. Efficient cost control measures will ensure that the project team controls the circumstances surrounding the project procurement instead of the circumstances controlling them.

An Evaluation of Budgeting and Cost Control of a Building Construction Industry
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0187
  • Access Fee: ₦5,000 ($14)
  • Pages: 42 Pages
  • Format: Microsoft Word
  • Views: 292

500
Leave a comment...

    Related Works

    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT It is interesting to bring to light the demands challenges and development in the twenty-first century the key role of the quantity surveying profession in the economic with emphasis on an appraisal of the quantity surveyor cost control in Nigeria construction industry. The work shall attempt to explore the quantity surveyor who is... Continue Reading
    ABSTRACT It is interesting to bring to light the demands challenges and development in the twenty-first century the key role of the quantity surveying profession in the economic with emphasis on an appraisal of the quantity surveyor cost control in Nigeria construction industry. The work shall attempt to explore the quantity surveyor who is... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE) ABSTRACT This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA   (A CASE STUDY OF ENUGU STATE) ABSTRACT  This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and... Continue Reading
    ABSTRACT This research report was carried out to ascertain whether traditional costing techniques (standard, marginal and absorption costing) are still relevant for today’s demand and greater cost accuracy. Managers and Accounting are confused about which of these techniques will enhance effective cost control and effective management decision.... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    Call Us Get this work