FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS IN NORTHERN NIGERIA

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0013
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
Several researches have been carried out in order to develop frameworks for determining performance of construction projects which were mostly based on Traditional criteria (i.e. cost, time and quality) only. And researches have highly criticized the use of traditional criteria only while determining construction project performance due to its inadequacy. However, literature has never developed framework for determining performance of Construction Projects using the emerging/non-traditional criteria since they also influence performance. This study developed a framework using the emerging construction projects performance criteria in the Northern Nigeria which was achieved through the following objectives; the identification of emerging criteria for determining performance of construction projects, assessment of the level of importance of the emerging criteria and development of framework for determining performance of construction projects using the emerging criteria. A total of 285 questionnaires were distributed to some construction industry stakeholders (i.e. Consultants, Contractors, Clients and End-users) were asked to assess the level of importance of the emerging criteria. A total of 147 valid questionnaires were retrieved which represents 51.58% of valid response rate and subsequently analysed using descriptive analysis with the aid of Statistical Package for Social Sciences (SPSS) software. The most important criteria ranked by the respondents are; client satisfaction on outcome, effective risk management, client satisfaction on cost, client satisfaction on time etc. Most important criteria ranked by respondents are client oriented base. Using the emerging criteria for determining performance of construction projects as ranked by respondents in descending of priority will help the parties of the construction industry to understand how important those criteria are. Furthermore, it was also found that most important criteria as key areas of activity which favorable results are absolutely necessary for a goal to be achieved. Additionally, using the framework developed in this study for determining performance of construction projects will help in the monitoring of performance and redirect organisational action when necessary. Lastly, it can also help the contractors’ and other key stakeholders of the construction industry particularly the clients and consultants to monitor and evaluate projects more accurately towards achieving project objectives.





CHAPTER ONE
INTRODUCTION
1.1              Background to the study
The construction industry is dynamic in nature due to the increasing uncertainties in technology, budgets, and development processes (Chan, Scott and Ada, 2004). They further reported that, building projects are becoming much more complex and difficult, and facing unprecedented changes. Those uncertainties, along with many other documented problems, are the root causes of project delays and decline in construction projects performance (Ofori, 1991; Ogunlana, Promkuntong and Jearkirm, 1996).
The improvement of performance has become more critical to the success of construction projects which have been the subject of considerable amount of research and attention over the past two decades (Al-Otaibi, Omani and Price, 2013).
Studies have shown decline in construction projects performance both locally and internationally (Ogunlana, Li and Sukhera, 2003; Komolafe, Kingsley and Muhammad, 2014).
A number of authors have worked significantly on ways to improve performance from the view point of traditional criteria (i.e. cost, time and quality) (Neely et al., 1994; Idrus and Sodangi, 2010; Barkley and Saylor, 1994). Furthermore, in response to the decline of projects performance, several studies have developed and advocated the use of frameworks for assessing construction projects with a view to improve their performance (Cocca and Alberti, 2009; Kagioglou, Cooper and Ghassan, 2001; Belassi and Tukel, 2006). But the frameworks developed by several researches were mostly based on the traditional criteria that have been highly criticized (Paul, 2014). 
FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS IN NORTHERN NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0013
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.1K

500
Leave a comment...

    Related Works

    Most of the road contractors in Kenya have been unable to provide effective services  specifically in the maintenance of road. There have existed a sharp criticism against their  performance where the Government has come up with strategies like performance  contracting, setting up state authorities like KeNHA, KURA, KeRRA and KRB so as to... Continue Reading
    ABSTRACT The construction is one of the oldest industries in almost every nation. Its importance made it possible for undeveloped countries to rise up to becoming developed Countries. Lately, there have been an undesirable adherence to performance specification in most construction sites in most developing countries. This study seeks to reveal how... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT Several studies on construction craft skills have identified a number of problems including ineffective training as responsible for shortages of craftsmen in the construction industry. In Nigeria, the problem of training craftsmen has been attributed to lack of a harmonised training framework. This research therefore examined existing... Continue Reading
    Improvement of road infrastructure was identified by the Kenyan Government in its Vision 2030 as one of the critical drivers of the country’s economic transformation. Whereas the Government has continued to invest heavily towards road construction, the challenge of delays in completion of road construction projects and cost overruns continue to... Continue Reading
    ABSTRACT  Performance of construction projects in Kenya is a matter of great concern to stakeholders, as most of the construction projects have experienced delays and cost overruns which have adversely affected their performance. Construction projects are very prone to risk which have the significant impact on their performance in terms of time,... Continue Reading
        TABLE OF CONTENTS Cover Page – – – – – – – – – – Title Page – – – – – – – – – – Certification – – – – – – – – – – Dedication – – – – – – – – – – Acknowledgement – – – – – – – – –... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.  Time factors are inherent... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA   (A CASE STUDY OF ENUGU STATE) ABSTRACT  This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and... Continue Reading
    Call Us Get this work