AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0015
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 67 Pages
  • Format: Microsoft Word
  • Views: 1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
Productivity is one of the important elements in construction planning and scheduling. However, construction industries in Nigeria are currently lacking in data with regard to productivity of the building’s construction activities especially in tiling works. The focus of the study was to use work study approach to empirically establish labour output for wall tiles for the Nigeria construction industry as well as to establish relationship between the influential factors and productivity. A total of 46 gang sizes of tilers for wall tiles 400mm x 300mm x 5mm, width > 300mm long side horizontal,32 gang sizes of tilers for wall skirting 400mm x 50mm high and Riser 400mm x 150mm high were observed within Kaduna state and Abuja. Physical observations and measurement of work outputs were conducted through work study approach. The data collected were analyzed using inferential data analysis techniques. The inferential tools made use of analysis of variance (ANOVA) for multiple comparison, paired sample t-test to compare two groups that are related and independent t-test to compare two group that are not related due each activities to assess and examine the influence of the various labour productivity factors on the outputs of the workers observed.. The result of the analysis carried out established general average output values per day of; 25.11m2, 31.37m, 23.41m for wall tiles 400mm x 300mm x 5mm, width > 300mm long side horizontal with backing, wall skirting 400mm x 50mm high and riser 400mm x 150mm high ,Ceramic tile 5mm thick in tiling work respectively. However, the test of difference conducted in order to analyze and investigate the extent of influence of the productivity factor discovered that, even though differences existed between outputs for wall, skirting and riser in tiling, the tests conducted confirmed they were quite insignificant, the mode of employment of tradesman observed had a tremendous effect on their output, those on daily paid term produced more on site in their outputs. The research concluded by recommending the outputs established to Contractors so as to exploit the output figures extracted according to productivity factors in order to optimize the productivity of their workers and profitability.





CHAPTER ONE
INTRODUCTION
1.1              Background to the Study
A building is one of man’s basic requirements after food and can be used to determine the development of any nation. Research has shown that the cost of building a house is high and principally depends on cost of labour and materials (Maloney, 1983, Omange, 2000).
Mohammed et al (2011) stated that the construction industry lagged due to insufficient research in the area of productivity. Methods for improving construction productivity to assist managers in identifying productivity barriers and offer solutions were limited. In contrast, there are few studies of enhanced productivity in the construction industry. In reality, increasing productivity benefits the stakeholders’ in several ways: Projects are completed more quickly; Project cost is lowered; the contractor can submit more competitive bids; and the project can be more profitable.
The construction of a house is capital intensive and seems to discourage some people from building personal houses. Government concerted effort at housing provision since independence in 1960 through the various national development plans seems not successful. Labour force in the building construction industry fall into skilled and unskilled. The financial implication of using any of the trades contribute to the cost of construction. The utilization of labour force in the construction industry accounts for a significant proportion of the cost of buildings (Udegbe, 2007).
AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0015
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 67 Pages
  • Format: Microsoft Word
  • Views: 1K

500
Leave a comment...

    Related Works

    ABSTRACT Th e  source and nature of output constants used for preparation of construction estimates should be accurate and reliable for the client to have confidence on the prepared estimates. This research is focused on using time study approach to empirically determine the outputs of block laying work items inconstruction industry. The study... Continue Reading
    The electricity produced by renewable energy sources (RES) is constantly increasing worldwide thanks to government policies and technological advancements. Photo voltaic cells are  actually a fast rising technology as the source of its power is a commodity that is abundant in  this part of the hemisphere. Uncertainty also dominates in the area... Continue Reading
    The electricity produced by renewable energy sources (RES) is constantly increasing world￾wide thanks to government policies and technological advancements. Photo voltaic cells are  actually a fast rising technology as the source of its power is a commodity that is abundant in  this part of the hemisphere. Uncertainty also dominates in the... Continue Reading
    TABLE CONTENTS CHAPTER ONE Introduction Retaining walls Cantilever rw Rankin theory Forces on cantilever rw Counterfort  rw Forces on counterfort rw The gravity rw Forces on gravity rw CHAPTER TWO Stability of retaining wall Soil properties of rws Drainage in rw Allowable bearing capacity CHAPTER THREE Procedure for the design of rw Analysis... Continue Reading
    INTRODUCTION Retaining walls are structures used in providing stability for earth or materials where conditions dis allow the materials from summing its nature al slope or stability There are many factors affecting or militating against the stability of retaining walls. These includes the level of water table behind the wall, size of the base of... Continue Reading
    TABLE CONTENTS CHAPTER ONE Introduction Retaining walls Cantilever rw Rankin theory Forces on cantilever rw Counterfort rw Forces on counterfort rw The gravity rw Forces on gravity rw Semi gravity rw CHAPTER TWO Stability of retaining wall Soil properties of rws Drainage in rw Allowable bearing capacity... Continue Reading
    ABSTRACT Retaining walls are structures used  in providing stability for earth or materials where conditions this allow the materials from summing its natural slope or stability. There are many factors affecting or militating against the stability of retaining walls. These includes the level of water table behind the wall, size of the base of the... Continue Reading
    TABLE CONTENTS CHAPTER ONE Introduction Retaining walls Cantilever rw Rankin theory Forces on cantilever rw Counterfort rw Forces on counterfort rw The gravity rw Forces on gravity rw CHAPTER TWO Stability of retaining wall Soil properties of rws Drainage in rw Allowable bearing capacity CHAPTER THREE... Continue Reading
    ABSTRACT This project was constructed with the desired materials of construction. The materials include aluminum, glass and wood. Aluminum was used in forming the skeleton of the structure, glass was used for the doors while wood was used in the sides, top, base and partitions. After building the skeleton of the... Continue Reading
    INTRODUCTION Retaining walls are structures used  in providing stability for earth or materials where conditions dis allow the materials from summing its nature al slope or stability There are many factors affecting or militating against the stability of retaining walls. These includes the level of water table behind the wall, size of the base of... Continue Reading
    Call Us Get this work