1.0            INTRODUCTION

As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.

          It may not be taken seriously in some places where power supply is up to 90 constant or where intermittent outage causes no great damage. However, place where they have business centers, industrial centers and even cold rooms need to almost 100% supply. So in this case there is need to provide a standby power supply in the event of power outage. The most important task is just to provide a standby power supply by great attention is paid to the reliability of the system. That is immediately and change over without fluctuations.

          The first type of change over switch were purely manual operated. They usually have three switch able position, main, off and generator. An arm is provided from where the operator can have access to the switching. Here, the effectiveness of the switching (i.e how fast it is effected each time power needs to be changed) largely depends on the operator. The change over system will be ineffective when the operator is not around.

          The second generation of change over switches were made semi-automatic in which the mains power supply directly powers the contactors. This arrangement is wired is such a way that if the mains power supply fails, the contractors will all drop leaving the supply to the generator position. The effectiveness of the system will now depend on the operator top start up the generator on time.

          The main problem suffered by the above mentioned two versions of the change over switch is that the operator must have to be continuously on duty for it to be very effective. They lent use full closed loop system to operate.

DESIGN AND CONSTRUCTION OF 25AMPS SINGLE PHASE AUTOMATIC CHANGE OVER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0089
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.1K

500
Leave a comment...

    Related Works

    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading
    The scope of the project covers aspects like the features of automatic three phase selector, its applications, and its operations. Its advantages and its components. Finally, it covers the importance on the need of automatic three phase selector and contributions toward a greater sharing load balance and a better three phase power distribution and... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Phase Selector.           In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector.         In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough... Continue Reading
    Call Us Get this work