DESIGN AND CONSTRUCTION OF A SINGLE PHASE MICROCONTROLLER BASED AUTOMATIC CHANGEOVER WITH GENERATOR STARTER

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0204
  • Access Fee: ₦5,000 ($14)
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 952
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are processes that cannot be interrupted because of their importance, for instance surgery operation in hospitals, conducting research, transfer of money between banks and lots more. This project presents the construction of an automatic changeover switch for power failure with generator starter that switches power supply from public supply to generator once there is public power supply outage and this is performed automatically. This is achieved by the use of integrated circuits that have timing abilities and relay to effect switching.
TABLE OF CONTENT
Title Page - - - - - - - - - i
Declaration - - - - - - - - - ii
Approval Page - - - - - - - - - iii
Dedication - - - - - - - - - iv
Acknowledgement - - - - - - - - v
Abstract - - - - - - - - - vi
Table of Content - - - - - - - - vii
List of Tables - - - - - - - - - ix
List of Figures - - - - - - - - - x

CHAPTER ONE: INTRODUCTION
1.1 Background Information - - - - - - - 1
Statement of the Problem - - - - - - - 1
Aims and Objectives of the project - - - - - 1
1.4 Need for Automation - - - - - - - 2
1.5 High frequency switching technology - - - - - 2
1.6 Generator - - - - - - - - - 2

CHAPTER TWO: Literature Review
2.0 Introduction: - - - - - - - - 3
2.1 Literature Review - - - - - - - - 3

CHAPTER THREE: Design And Construction
3.1 Introduction - - - - - - - - 5
3.2 Block Diagram of Automatic Changeover Switch - - - 5
3.3 Circuit description of Automatic Changeover Switch - - - 8
3.4 Power Supply Unit - - - - - - - 9
3.5 Controlling Unit (PIC16F876A) - - - - - - 12
3.6 Program Memory Organization - - - - - - 15
3.7 Liquid Crystal Display - - - - - - - 20
3.8 Relay - - - - - - - - - 22
3.9 Design - - - - - - - - - 24
3.10 Construction - - - - - - - - 36
CHAPTER FOUR:  Test, Results and Discussions
  Introduction - - - - - - - - 37
4.2 Test And Result on power supply - - - - - 37

CHAPTER FIVE: Summary, Conclusion and Recommendations
5.1 Summary - - - - - - - - 39
5.2 Conclusion - - - - - - - - 39
5.3 Recommendation - - - - - - - - 39
REFERENCES - - - - - - - - 40 

LIST OF TABLES
Table 3.1: Truth Table of Automatic Changeover Switch. - - - 6
Table 3.2: Relay Test - - - - - - - - 7
Table 3.3: PIN Configuration - - - - - - - 13
Table 3.4: Microcontroller Circuit Gain - - - - - 15
DESIGN AND CONSTRUCTION OF A SINGLE PHASE MICROCONTROLLER BASED AUTOMATIC CHANGEOVER WITH GENERATOR STARTER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0204
  • Access Fee: ₦5,000 ($14)
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 952

500
Leave a comment...

    Related Works

    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage.  Power instability or outage in... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    This work is based on automatic changeover switch. If there is failure in main power supply it will automatically change to auxiliary power supply such as generator. This project is based on electromechanical changeover with the use of magnetic contractors, relay,and circuit breaker. ... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    Call Us Get this work