A Simulation Model for Factory Productivity Momtoring

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1769
  • Access Fee: ₦5,000 ($14)
  • Pages: 33 Pages
  • Format: Microsoft Word
  • Views: 177
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

TABLE OF CONTENTS

DECLARATION

APPROVAL

DEDICATION

ACKNOWLEDGEMENT

TABLE OF CONTENTS

ABSTRACT

CHAPTER ONE 1

INTRODUCTION 1

1.1 Background ofthe study 1

1.2 Case study description 2

1.3 Problem Statement 2

1.4 Project Objectives 3

1.4.1 General Objective 3

1.4.2 Specific Objectives 3

1.5 Justification ofthe study 3

1.6 Project scope 3

CHAPTER TWO 4

LITERATURE REViEW 4

2.1 Introduction 4

2.2 Simulation Models 4

2.3 Applications of Simulation Models 4

2.4 Characteristics of simulation models 5

2.5 Model types and their comparisons 6

2.6 Classification of Simulation Models 6

2.7 Discrete Event Simulation Model 7

2.8 Productivity 8

2.9 Productivity monitoring 8

2.10 Conclusion 9

CHAPTER THREE 10

METHODOLOGY 10

V

3.1 Overview. 10

3.2 System study 10

3.2.1 Reading 10

3.2.2 Interviews

3.2.3 Questionnaires 10

3.2.4 Observation

3.3 Analysis 11

Figure 1. Process map 12

3.4 Development ofthe Model 13

3.4.1 Determining model requirements 13

3.5 Testing and validation 13

ChAPTER FOUR 14

SYSTEM DESIGN AND IMPLEMENTATION 14

4.1 Model Design 14

Table 2. Production resources, their types and unit ofmeasure 14

The simulation process 14

4.2 Implementation 20

CHAPTER FIVE 21

FINDINGS, CONCLUSIONS AN]) RECOMMENDATIONS 21

5.1 Discussion 21

5.2 Conclusion 21

5.3 Recommendations 21

REFERENCES 22

APPENDICES 23

APPENDIX A 23

Questionnaire 23

APPENDIX B 25

Sample System Codes 25


ABSTRACT

This project is about a productivity simulation system for a factory. It is a real timesystem, which has been designed to monitor productivity by capturing information on all the resources that are used in producing a unit quantity of a product. The resources in this project are people, water, furnace oil and electricity. The value of these resources for aspecific period oftime is divided by the quantity of product processed or produced in the same period to evaluate the unit cost of production in that period and hence the productivity of the factory can be monitored on an hourly basis. The simulation model isthus made to be an integral process in a processing factory rather than a system that checks performance after a process is complete.The system therefore works well when there is a system in place that captures all the resources that go into the manufacturing process accurately and on a regular basis.


A Simulation Model for Factory Productivity Momtoring
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1769
  • Access Fee: ₦5,000 ($14)
  • Pages: 33 Pages
  • Format: Microsoft Word
  • Views: 177

500
Leave a comment...

    Related Works

    Abstract Industrial accidents are on the rise. This fact is even more prevalent in developing countries where the countries lack the safety standards required to ensure workplace safety in the pursuit of economic development. As land in prime locations becomes increasingly scarce, there is an argument for building skyscrapers. But this just... Continue Reading
    ABSTRACT Changes in precipitation characteristics have been identified to exert profound socio-economic consequences over West Africa. This study analysed climate model simulation and projections of precipitation changes over West Africa using the Norwegian Earth System Model (NorESM with Lat-Lon resolution of 1.89° by 2.5°). The skill of the... Continue Reading
    ABSTRACT Turbulent flow is a type of fluid flow in which the fluid undergoes irregular fluctuations. The velocity of the fluid at a point is continuously undergoing changes in both magnitude and direction. Turbulent natural convection has been studied both numerically and theoretically. It plays an important role in the field of heat transfer and... Continue Reading
    Abstract This research determines the effect of leadership styles on the productivity of factory workers in the organization and how effective leadership contributes to efficiency. Several literatures were reviewed on the concept of leadership, theory of leadership, leadership styles, factors of leadership etc. The population size was 200 and the... Continue Reading
    This research determines the effect of leadership styles on the productivity of factory workers in the organization and how effective leadership contributes to efficiency. Several literature were reviewed on the concept of leadership, theory of leadership, leadership styles, factors of leadership etc. The population size was 200 and the sample... Continue Reading
    This research determines the effect of leadership styles on the productivity of factory workers in the organization and how effective leadership contributes to efficiency. Several literature were reviewed on the concept of leadership, theory of leadership, leadership styles, factors of leadership etc. The population size was 200 and the sample... Continue Reading
    Abstract This research determines the effect of leadership styles on the  productivity of factory workers in the organization and how effective  leadership contributes to efficiency. Several literatures were reviewed  on the concept of leadership, theory of leadership, leadership styles,  factors of leadership etc. The population size was 200... Continue Reading
    ABSRACT The impact of management incentive policies on worker‟s productivity. The place of good management incentive policies on employee‟s productivity cannot be over emphasized. Most incentives plans are designed to help increase efficiency in the organization. However, obtaining employee‟s acceptance of incentive system may be difficult... Continue Reading
    (A Case Study Of Skye Bank Plc Edo State)   ABSTRACT The broad objective of this research work is to take a critical look at the principle of total quality management so as to find out how its implementation will affect an organisation‟s productivity and profitability.... Continue Reading
    The effects of total quality management on-productivity-using-the-probit-model   ABSTRACT The broad objective of this research work is to take a critical look at the principle of total quality management so as to find out how its implementation will affect an organisation‟s productivity and profitability. For the purpose of this study, the... Continue Reading
    Call Us Get this work